Exceedances and events

A project has two pages to look back at what happened: Exceedances under Vibration measurements, for the exceedances of the standard, and Events under Measurement data, for all messages from the meters and the Dashboard. You also find the events of a single meter on the page of that meter.

Exceedances

The Exceedances page, titled Alarms Dashboard, gives an overview of all exceedances of the standard in a period. The page is still in development, so it is marked beta.

Exceedances

  • Choose the period with Yesterday, Today or This week, or with the arrows.
  • Under Select measurement points you narrow the overview down to a few measuring points. By default it shows all of them.
  • At the top right are the highest exceedances, with the percentage of the standard per axis. Expand an entry for more details.
  • Exceedances share per axis shows how many exceedances there were per axis, with the total in the middle.
  • All exceedances plots them over time, for velocity, acceleration and SBR B.
  • Exceedances per hour shows at which hour of the day they happened. This shows, for example, whether they coincide with the working hours on site.
  • Dominant frequencies shows the dominant frequency of each exceedance.
  • At the bottom is a table with all exceedances, with time, cluster, measuring point and message.
  • Download next to Export CSV saves the exceedances as a CSV file.

Events

The Events page shows messages from the Meters that are active in the project, and the messages the Dashboard has sent to contacts.

There are these types of notifications:

  1. Info These are service messages that tell you when a system has started up, started or stopped measuring, etc.
  2. Exceedance notifications are created when there has been an exceedance of the standard. This notification shows the exact time and the vibration level relative to the standard.
  3. Error If something goes wrong during measuring or with the normal operation of a Frogwatch Meter, this is reported with Error notifications. The meters try to detect what exactly is going wrong or what is broken and report it this way. Think of a broken sensor or a corrupt SD card. These notifications usually require action from the user. The meter may also need servicing.
  4. Warning messages are expected exceptions that can happen now and then, but that the meter can recover from by itself. You can often treat these as diagnostic notifications.
  5. Email and SMS are the messages the Dashboard has sent to contacts, for example for an exceedance.

Events

  • Choose the time range at the top. Next to it you see how many events of each type there are. Click a type to show only those events, or Total to see everything again.
  • The histogram shows the number of events per category.
  • The table lists the type, time, measuring point, meter and message of each event. With the menu above the table you choose which types to show; then click Load.
  • With the pencil icon you write a reaction to an event, for example what caused an exceedance. Other users of the project see that reaction too.
  • Export downloads the events as an Excel file.